File #: 2015-1949   
Type: Consent Calendar Item
Body: City Council
On agenda: 9/1/2015
Title: Recommendation to Award Three Separate Contracts in the Amount of $75,000 Each (Total Expenditure of $225,000) to the Following Providers: Salas O'Brien, YEI Engineers, Inc., and The Engineering Enterprise, for On-Call Electrical Engineering Services. (Public Works 310)
Attachments: 1. Exhibit 1 - Salas O'Brien Contract, 2. Exhibit 2 - YEI Engineers Contract, 3. Exhibit 3 - Engineering Enterprise Contract

Title

 

Recommendation to Award Three Separate Contracts in the Amount of $75,000 Each (Total Expenditure of $225,000) to the Following Providers: Salas O’Brien, YEI Engineers, Inc., and The Engineering Enterprise, for On-Call Electrical Engineering Services. (Public Works 310)

Body

To: Honorable Mayor and Members of the City Council

 

From: Elizabeth D. Warmerdam, Interim City Manager

 

Re: Recommendation to Award Three Separate Contracts in the Amount of $75,000 Each (Total Expenditure of $225,000) to the Following Providers: Salas O’Brien, YEI Engineers, Inc., and The Engineering Enterprise, for On-Call Electrical Engineering Services

 

BACKGROUND

 

On May 19, 2015, Public Works issued a Request for Proposal (RFP) for on-call electrical engineering services.  Staff recommends awarding contracts to three consultants Salas O’Brien, YEI Engineers, Inc., and The Engineering Enterprise, to provide on-call work during FY15-16 that includes capabilities in electrical, instrumentation and control engineering design and construction management, for repair and replacement of City infrastructure, such as field lighting and pump station instrumentation.

 

DISCUSSION

 

To solicit the maximum number of proposals and the most competitive price, the RFP was provided to 23 separate builders’ exchanges throughout the Bay Area.  Notices were also sent to consultants on the Public Works Department Consultant List.  In addition, notices were placed on the City’s web page and published in the Alameda Journal.  The RFPs were opened on June 8, 2015, after advertising for a period of 20 days. Five consultants submitted proposals.  The results are as follows:

 

Proposer

Location

Salas O’Brien

Oakland

YEI Engineers, Inc.

Oakland

The Engineering Enterprise

Alameda

ALFATECH

San Jose

Syska Hennessy Group

San Francisco

 

After reviewing the written proposals and contacting several references provided by the consultants, three firms were selected as best fitting the City’s needs.  Staff recommends awarding contracts to Salas O’Brien, YEI Engineers, Inc., and The Engineering Enterprise in the amount of $75,000 each.  The RFP also permits an annual extension of each contract on a year-to-year basis, for up to four additional years, and up to $375,000 total compensation for each contract, at the sole discretion of the Public Works Director, based upon satisfactory performance of all aspects of the contract.  A copy of each contract is attached as Exhibit 1, 2 and 3.

 

Scope of work for all three consultants includes the following on-call services:

                     Provide electrical, instrumentation, and control engineering design, including preliminary studies, public outreach, contract documents, estimates, and other professional services;

                     Provide construction management services; and

                     Provide in-house personnel or subconsultants for minor civil, structural, mechanical, asbestos abatement, lead abatement, landscape architecture, and LEED certification as needed to complete the mechanical engineering design.

 

Typical projects may include:

                     Supervisory control and data acquisition (SCADA) and electrical upgrades to sewer, storm drain, and lagoon pump stations, and lagoon motorized weirs;

                     Electrical, lighting, instrumentation, and control renovations in buildings; and

                     Field and pathway lighting in parks.

 

FINANCIAL IMPACT

 

Funding of each work order will be from the Capital Improvement Program project for which the electrical engineering services are provided.  The total budget for each contract for each fiscal year will be $75,000, but the actual amount expended will be delineated by work order and will likely be less based on projects assigned to the consultants.  The usage of the services is on an as-needed basis so that if the demand is not there, the services will not be requested.  There is no impact to the General Fund.

 

MUNICIPAL CODE/POLICY DOCUMENT CROSS REFERENCE

 

This action does not affect the Municipal Code.

 

ENVIRONMENTAL REVIEW

 

This action is exempt from the California Environmental Quality Act (“CEQA”) pursuant to CEQA Guidelines section 15061(b)(3).

 

RECOMMENDATION

 

Award three separate contracts in the amount of $75,000 each (total expenditure of $225,000) to the following providers: Salas O’Brien, YEI Engineers, Inc., and The Engineering Enterprise, for on-call electrical engineering services.

 

Respectfully submitted,

Liam Garland, Acting Public Works Director

 

By,

Laurie Kozisek, Associate Civil Engineer

 

Financial Impact section reviewed,

Elena Adair, Finance Director

 

Exhibits:

1.                           Salas O’Brien Contract

2.                           YEI Engineers, Inc. Contract

3.                           The Engineering Enterprise Contract