File #: 2014-735   
Type: New Business
Body: Transportation Commission
On agenda: 7/30/2014
Title: Approve installation of a Bulb-out at Park/Lincoln Northwest Corner and Further Study the Option of Reducing Pedestrian Crossing Distance for the North-South Crosswalks
Attachments: 1. Exhibit 1 - Traffic Signals Lincoln Avenue and Park Street, and Bulb-out for Approval at the Northwest Corner
Title

Approve installation of a Bulb-out at Park/Lincoln Northwest Corner and Further Study the Option of Reducing Pedestrian Crossing Distance for the North-South Crosswalks

Body

Transportation Commission
July 30, 2014
Item 5A
Action
Approve installation of a Bulb-out at Park/Lincoln Northwest Corner and Further Study the Option of Reducing Pedestrian Crossing Distance for the North-South Crosswalks

BACKGROUND

This project was approved by the Transportation Commission in March 26, 2014, with the exception that Park/Lincoln/Tilden way be studied further to include a bulb-out at the northwest quadrant of the intersection.

DISCUSSION

Staff consultant team DKS/Stantec has reviewed the feasibility to install bulb-outs at the southwestern and southeastern corners of the Park Street/Lincoln Avenue/Tilden Way
Intersection without any associated loss of parking spaces and per the TC member request assessed the feasibility of installing bulb-out at the northwest quadrant of the intersection to enhance pedestrian traffic safety.

The assessment includes analyzing geometric constraints and identifying any potential loss of parking spaces to provide room for the installation of a bulb-out. Based on their assessment, it is feasible to install a bulb-out at the northwestern corner of the intersection (Exhibit 1), but it will result in the loss of two parking spaces to accommodate the bulb-out along with other additional improvements listed below:

1. Bulb-out portion along Lincoln Avenue will extend 8-feet into the roadway
2. Bulb-out portion along Park Street will extend 3.5 feet into the roadway
3. Furnish and install 2 curb ramps
4. Furnish and install 20-feet, 12" diameter, reinforced concrete pipe
5. Remove existing storm drain inlet
6. Reset existing fire hydrant
7. Relocate traffic signal poles and equipment

RECOMMENDATION

Staff requests that the Transportation Commission review and approve the installation of a bulb-out ...

Click here for full text